A corrosion management method is provided and includes storing an asset fleet at a location, generating a corrosion rate stressor by reference to models for any component of an asset of the asset fleet corresponding to the location and storage practice of the asset, predicting an accumulated corrosion stressor severity from the generated corrosion rate stressor, measuring an actual corrosion rate stressor at the location and revising the models in accordance with a difference between the predicted accumulated corrosion stressor severity and the measured actual corrosion rate stressor.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Method for predicting corrosion potential, monitoring contaminant load and optimizing corrosion maintenance


    Beteiligte:
    PALMER CARL (Autor:in)

    Erscheinungsdatum :

    28.07.2020


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    G07C TIME OR ATTENDANCE REGISTERS , Zeit- oder Anwesenheitskontrollgeräte / B64D Ausrüstung für Flugzeuge , EQUIPMENT FOR FITTING IN OR TO AIRCRAFT / B64F GROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT , Boden- oder Flugzeugträgerdeckeinrichtungen besonders ausgebildet für die Verwendung in Verbindung mit Luftfahrzeugen / G01N Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften , INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES





    Corrosion maintenance scheduling

    Online Contents | 1996


    METHOD AND SYSTEM FOR OPTIMIZING THE MAINTENANCE OF AN AIRCRAFT STRUCTURE AGAINST CORROSION

    BENEKE MARTIN / LUCE ALEXANDRA / ECAULT ROMAIN et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Marine condenser corrosion and maintenance

    Griffiths, C.A. | Engineering Index Backfile | 1930