To allow proper timing for performing filter replacement to be grasped in advance, while reducing the replacement frequency of the filter for removing dust from the air used by the equipment system such as a storage cell and the like, in a railway vehicle.SOLUTION: A maintenance support system of a railway vehicle which supports maintenance of a filter for removing dust from an air used by an equipment system mounted on a railway vehicle, estimates maintenance timing for performing maintenance of the filter with respect to filter clogging by dust, using a clog index showing a clogging situation of the filter by the dust, and notifies of, as the estimated maintenance timing, a timing of vehicle maintenance that is planned, on the basis of a vehicle maintenance plan of the railway vehicle, to be performed immediately before a timing when the clog index reaches a clog index upper limit value of when a temperature of the equipment system reaches an upper limit.SELECTED DRAWING: Figure 11


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    鉄道車両のメンテナンス支援システムおよびメンテナンス支援方法


    Erscheinungsdatum :

    2024-05-28


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Japanisch


    Klassifikation :

    IPC:    B60L PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES , Antrieb von elektrisch angetriebenen Fahrzeugen / B61C Lokomotiven , LOCOMOTIVES / B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    芝生メンテナンス機

    Europäisches Patentamt | 2021

    Freier Zugriff

    芝生メンテナンス機

    Europäisches Patentamt | 2024

    Freier Zugriff


    昇降機のメンテナンス支援システム

    Europäisches Patentamt | 2020

    Freier Zugriff