To appropriately perform equalization and prolongation of lives of inverters which are connected in parallel.SOLUTION: An inverter control system has such a configuration that a power source is supplied to a motor 14 for driving an elevator by N pieces (N is integer of 2 or greater) of inverters 110 to 190 which are connected in parallel and controls each of the inverters which are connected in parallel. The inverter control system includes: a load detection part 301 for detecting a loading amount of the elevator; a maximum load current calculation part 302 for calculating a required maximum load current according to the loading amount detected by the load detection part and speed of the elevator; and a gate command part 201 for restricting the inverter operated for supplying the power source to the motor to less than N pieces among N pieces of the inverters 110 to 190 which are connected in parallel, according to the maximum load current calculated by the maximum load current calculation part.SELECTED DRAWING: Figure 4
【課題】並列接続されたインバータの寿命の均等化や長寿命化が、適切に行えるようにする。【解決手段】N個(Nは2以上の整数)に並列接続されたインバータ110~190により、昇降機を駆動するモータ14に電源を供給する構成とした上で、並列接続されたそれぞれのインバータを制御するインバータ制御システムである。そして、昇降機の積載量を検出する負荷検出部301と、負荷検出部が検出した積載量と昇降機の速度に応じて必要な最大負荷電流を算出する最大負荷電流算出部302と、最大負荷電流算出部が算出した最大負荷電流に応じて、N個に並列接続されたインバータ110~190の中で、モータに電源を供給するために作動させるインバータを、N個未満に制限するゲート指令部201とを備える。【選択図】図4
INVERTER CONTROL SYSTEM AND INVERTER CONTROL METHOD
インバータ制御システム及びインバータ制御方法
2023-06-22
Patent
Elektronische Ressource
Japanisch
IPC: | B66B Aufzüge , ELEVATORS / H02M APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS , Anlagen zur Umformung von Wechselstrom in Wechselstrom, von Wechselstrom in Gleichstrom oder umgekehrt, oder von Gleichstrom in Gleichstrom und zur Verwendung in Netzen oder ähnlichen Stromversorgungssystemen |