To provide a delay time analysis device capable of analyzing the delay caused by a plurality of factors, a delay time analysis method, and a train operation support system.SOLUTION: A delay time analysis device 1 includes a calculation part 22, a generation part 26, and a display control part 35. The calculation part 22 calculates an explanatory variable by using at least any of arrival time and departure time of each train at each station in a predetermined railway section. The generation part 26 sets delay time of the predetermined train at a predetermined railway station in a predetermined railway section as an objective variable and generates a regression formula with respect to the objective variable by an explanatory variable with a predetermined contribution selected from the explanatory variables. The display control part 35 displays information about the delay time on a display part 30 based on the regression formula.SELECTED DRAWING: Figure 1

    【課題】複数の要因により発生する遅延を分析可能である延時間分析装置、遅延時間分析方法、及び列車運転支援システムを提供する。【解決手段】遅延時間分析装置1は、算出部22と、生成部26と、表示制御部35とを備える。算出部22は、鉄道の所定区間の各駅における各列車の到着時刻及び出発時刻の内の少なくともいずれかを用いて説明変数を算出する。生成部26は、鉄道の所定区間内の所定の駅及び記所定の列車における遅延時間を目的変数とし、説明変数の中から選択された所定の寄与を有する説明変数により目的変数に対する回帰式を生成する。表示制御部35は、回帰式に基づいて、遅延時間に関する情報を表示部30に表示させる。【選択図】図1


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    DELAY TIME ANALYSIS DEVICE, DELAY TIME ANALYSIS METHOD, AND TRAIN OPERATION SUPPORT SYSTEM


    Weitere Titelangaben:

    遅延時間分析装置、遅延時間分析方法、及び列車運転支援システム


    Beteiligte:
    SOTOZAKI YUKINORI (Autor:in) / KOIZUMI YOSHIHIRO (Autor:in) / NAMEKI HIDEAKI (Autor:in) / MIYOSHI KYO (Autor:in) / TSUJI HIROSHI (Autor:in) / IYAMA HITOSHI (Autor:in) / AOKI TAKESHI (Autor:in)

    Erscheinungsdatum :

    25.07.2019


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Japanisch


    Klassifikation :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES



    Delay analysis for train operation

    Lee, C.K. | Tema Archiv | 1998


    Delay analysis for train operation

    Lee, C. K. / Wessex Institute of Technology | British Library Conference Proceedings | 1998


    Real-time rescheduling method and device for solving train operation delay

    KWAK HO-CHAN / WU XIWEN / SONG JI-YOUNG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Train time delay protection conversion method

    MIN RUI / CHEN XIANG / XIA TINGKAI et al. | Europäisches Patentamt | 2022

    Freier Zugriff