PROBLEM TO BE SOLVED: To automatically prepare a train diagram.SOLUTION: A processor executes: acquisition processing for acquiring a movement demand in a time zone subjected to train diagram preparation in an examination object route; first calculation processing for calculating the number of required service in the time zone subjected to train diagram preparation in the examination object route on the basis of the movement demand acquired by the acquisition processing and capacity of a mobile body; second calculation processing for calculating operation intervals at which the mobile body operates in the time zone subjected to train diagram preparation on the basis of the time length of the time zone subjected to train diagram preparation and the number of required service calculated by the first calculation processing; and preparation processing for preparing a train diagram on which the mobile body operates on the object route in the time zone subjected to train diagram preparation at the operation intervals calculated by the second calculation processing.

    【課題】ダイヤを自動作成すること。【解決手段】プロセッサが、検討対象経路におけるダイヤ作成対象の時間帯における移動需要を取得する取得処理と、前記取得処理によって取得された移動需要と前記移動体の定員とに基づいて、前記検討対象経路における前記ダイヤ作成対象の時間帯での必要便数を算出する第1の算出処理と、前記ダイヤ作成対象の時間帯の時間長と、前記第1の算出処理によって算出された必要便数と、に基づいて、前記移動体が前記ダイヤ作成対象の時間帯に運行する運行間隔を算出する第2の算出処理と、前記第2の算出処理によって算出された運行間隔により、前記移動体が前記ダイヤ作成対象の時間帯に前記検討対象経路を運行するダイヤを作成する作成処理と、を実行する。【選択図】図1B


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    OPERATION PLAN SERVER AND TRAIN DIAGRAM PREPARATION METHOD


    Weitere Titelangaben:

    運行計画サーバ、およびダイヤ作成方法


    Beteiligte:
    EIMAEDA NAOYA (Autor:in) / YANO HIROHITO (Autor:in) / YAMAZAKI JUN (Autor:in) / FUSE YASUHIRO (Autor:in)

    Erscheinungsdatum :

    2015-10-22


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Japanisch


    Klassifikation :

    IPC:    G08G Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs , TRAFFIC CONTROL SYSTEMS / B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES



    TRAIN OPERATION DIAGRAM CORRECTION DEVICE AND TRAIN OPERATION DIAGRAM CORRECTION PROGRAM

    KUBO HIDEKI | Europäisches Patentamt | 2016

    Freier Zugriff

    TRAIN OPERATION DIAGRAM CORRECTION DEVICE AND TRAIN OPERATION DIAGRAM CORRECTION PROGRAM

    KUBO HIDEKI | Europäisches Patentamt | 2017

    Freier Zugriff

    Railway Train Working Diagram Plan System

    Ni, Shaoquan / Lyu, Miaomiao / Lv, Hongxia | Springer Verlag | 2017


    OPERATION MANAGEMENT DEVICE AND TRAIN DIAGRAM PREPARATION DEVICE

    OGUMA KENJI / MIYAUCHI TSUTOMU / SUZUKI MOTOYA et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    TRAIN DIAGRAM SIMULATION DEVICE, TRAIN DIAGRAM SIMULATION METHOD AND TRAIN DIAGRAM SIMULATION PROGRAM

    HIROTA ATSUSHI / HATAYAMA GORO | Europäisches Patentamt | 2023

    Freier Zugriff