The method involves disconnecting a sinkable float (20) of anchor line systems (3a, 3b, 3c) and an electrical cable (40). A floating wind turbine device (1) is transferred from a production site to a maintenance device (5) by towing. The turbine device is positioned on the maintenance device, so that the turbine device is supported by the maintenance device. The maintenance device is fixed at the bottom (F) of a sub-marine. The turbine device is positioned on a lifting system (6) of the maintenance device. The turbine device is positioned above a movable immersed support (61). An independent claim is also included for a system for producing off-shore wind energy.
PROCEDE POUR LA REALISATION D'OPERATIONS DE MAINTENANCE SUR UN DISPOSITIF D'EOLIENNE FLOTTANTE OFFSHORE ET SYSTEME CORRESPONDANT
12.08.2016
Patent
Elektronische Ressource
Französisch
SYSTEME D'EOLIENNE FLOTTANTE AYANT UNE ACCESSIBILITE AUGMENTEE.
Europäisches Patentamt | 2021
|DISPOSITIF FLOTTANT SUPPORT D'EOLIENNE OFFSHORE ET ENSEMBLE EOLIEN FLOTTANT CORRESPONDANT
Europäisches Patentamt | 2017
|DISPOSITIF FLOTTANT SUPPORT D'EOLIENNE OFFSHORE ET ENSEMBLE EOLIEN FLOTTANT CORRESPONDANT
Europäisches Patentamt | 2020
|DISPOSITIF D'ACTIONNEMENT POUR SYSTEME D'EOLIENNE DE SECOURS D'AERONEF
Europäisches Patentamt | 2017
|