The method may comprise building a first lowermost section of the shaft (20) and installing guide rail elements (25) to the first section of the shaft. An installation platform (500) moving on guide rails transports and supports installation apparatuses. An outer wall (50A) and an inner wall (50B) of the shaft may then be raised upwards after which the space between the outer wall and the inner wall may be filled with concrete. When the wall construction has reached a height of a new section of guide rail elements, then a new section of guide rail elements may be installed to the wall construction.
A METHOD FOR ELEVATOR SHAFT CONSTRUCTION AND GUIDE RAIL INSTALLATION
VERFAHREN ZUR KONSTRUKTION VON AUFZUGSSCHÄCHTEN UND ZUR INSTALLATION VON FÜHRUNGSSCHIENEN
PROCÉDÉ DE CONSTRUCTION DE CAGE D'ASCENSEUR ET D'INSTALLATION DE RAILS DE GUIDAGE
2020-10-07
Patent
Elektronische Ressource
Englisch
IPC: | B66B Aufzüge , ELEVATORS |
Installation device and installation method for elevator shaft guide rail
Europäisches Patentamt | 2023
|METHOD AND DEVICE FOR INSTALLATION OF ELEVATOR GUIDE RAIL TO ELEVATOR SHAFT
Europäisches Patentamt | 2021
|METHOD AND DEVICE FOR INSTALLATION OF ELEVATOR GUIDE RAIL TO ELEVATOR SHAFT
Europäisches Patentamt | 2021
|GUIDE RAIL INSTALLATION DEVICE OF ELEVATOR AND GUIDE RAIL INSTALLATION METHOD
Europäisches Patentamt | 2023
|