The invention relates to a switchover between element controllers (control units on the track) made by means of a signal box. The signal box determines an error in a first element controller and activates the second element controller. The second element controller controls a selection circuit by means of a trigger signal in such a way that, instead of the output of the first element controller, the output of the second element controller is connected to at least one actuator and/or at least one sensor. The invention further relates to a corresponding system. The reliability is thus advantageously increased.
UMSCHALTUNG ZWISCHEN ELEMENT-CONTROLLERN IM BAHNBETRIEB
SWITCHOVER BETWEEN ELEMENT CONTROLLERS IN RAILWAY OPERATION
COMMUTATION ENTRE CONTRÔLEURS D'ÉLÉMENTS PENDANT LE FONCTIONNEMENT D'UNE VOIE DE CHEMIN DE FER
2020-11-18
Patent
Elektronische Ressource
Deutsch
UMSCHALTUNG ZWISCHEN ELEMENT-CONTROLLERN IM BAHNBETRIEB
Europäisches Patentamt | 2020
|UMSCHALTUNG ZWISCHEN ELEMENT-CONTROLLERN IM BAHNBETRIEB
Europäisches Patentamt | 2018
|UMSCHALTUNG ZWISCHEN ELEMENT-CONTROLLERN IM BAHNBETRIEB
Europäisches Patentamt | 2018
|Vollautomatisierter Bahnbetrieb
Springer Verlag | 2021
|