In a method of backfilling spoil (M) into a seabed trench (T), a blade (310) is propelled to travel forward on the seabed (S) and collect spoil (M) along the sides of the trench (T). The collected spoil (M) is funneled toward a rear apex (313) of the blade (310). The funneled spoil (M) is allowed to be discharged through an opening (311) in the blade apex (313) and onto the top surface of a pipe (C) disposed in the trench (T). The spoil (M) discharged into the trench (T) may then be leveled. The discharged spoil (M) may also be fragmented before it reaches the pipe (C).


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    BACKFILL METHOD FOR SEABED SPOIL


    Weitere Titelangaben:

    HINTERFÜLLUNGSVERFAHREN FÜR AUSHUB AM MEERESBODEN
    PROCÉDÉ DE REMBLAYAGE POUR DÉBLAIS DANS LE FOND MARIN


    Beteiligte:

    Erscheinungsdatum :

    24.07.2019


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    E02F Baggern , DREDGING / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / H02G INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES , Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen



    Spoil heaps

    Engineering Index Backfile | 1950


    Hopper transport of dredged spoil

    Low, D.W. | Engineering Index Backfile | 1956



    BACKFILL PLOW

    WILSON MICHAEL W N | Europäisches Patentamt | 2018

    Freier Zugriff