Transfer equipment for prefabricated wall installation construction belongs to the technical field of lifting transfer equipment and comprises a lifting beam, a sliding rod and a clamping block. A steel wire connected with hoisting equipment is arranged at the top of the hoisting beam, a plurality of clamping grooves are formed in the bottom of the hoisting beam in the length direction, and mounting holes are formed in the hoisting beam and communicate with the clamping grooves; the sliding rod is arranged in the mounting hole in a penetrating mode, connecting rods with the same number as the clamping grooves are arranged at the bottom of the sliding rod, supporting rods with the same distance as the sliding rod are arranged at the lower ends of the connecting rods, the supporting rods face the rear end of the sliding rod, a gap is formed between the ends of the adjacent supporting rods, and a gap is formed between the supporting rods and the roots of the clamping grooves; the sliding rod is movably arranged in the length direction of the hanging beam. A plurality of clamping blocks are arranged on the two sides, corresponding to the hanging beam, of the clamping blocks, and when the sliding rods move towards the rear end, the connecting rods push the clamping blocks to swing towards the outer side of the hanging beam. According to the scheme, connection with the prefabricated wall can be automatically unlocked, manual operation is not needed, and the unlocking process is rapid.

    一种预制墙体安装施工用转移设备,属于起吊转移设备技术领域,包括吊梁、滑移杆及卡块。吊梁顶部设有与起吊设备相连的钢丝,吊梁的底部沿长度方向开设有多个卡槽,吊梁内部开设有安装孔,安装孔与卡槽连通;滑移杆穿设于安装孔内,滑移杆的底部设有与卡槽数量相同的连接杆,连接杆的下端均设有与滑移杆距离相同的支撑杆,支撑杆均朝向滑移杆的后端,且相邻支撑杆的端部之间具有间隔,支撑杆与卡槽根部之间具有间隔,滑移杆沿吊梁的长度方向移动设置;卡块对应吊梁的两侧均设有多块,滑移杆向后端移动时,连接杆推动卡块向吊梁的外侧摆动。本方案可自动解开与预制墙体之间的连接,无需人工操作,并且解锁过程快捷。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Transfer equipment for mounting construction of prefabricated wall


    Weitere Titelangaben:

    一种预制墙体安装施工用转移设备


    Beteiligte:
    JIANG BO (Autor:in)

    Erscheinungsdatum :

    13.05.2025


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66C Krane , CRANES



    Auxiliary mounting device for prefabricated wall

    SHAN HAOLIANG / LUO YEKE / ZHOU LIQIANG | Europäisches Patentamt | 2022

    Freier Zugriff

    Hoisting and mounting integrated construction method for prefabricated wall pieces of fabricated diaphragm wall

    WANG JIN / ZENG XIANGJI / BAO YANGYANG et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    LIFT NUT MOUNTING BRACKET FOR PREFABRICATED WALL PANELS

    REZNAR JASON / TELLER WILLIAM GREGORY / MCCULLAH JUSTIN | Europäisches Patentamt | 2025

    Freier Zugriff

    Prefabricated wall transfer device

    LYU NA / XIA QING | Europäisches Patentamt | 2023

    Freier Zugriff

    Prefabricated wall hoisting construction method

    ZHANG LINJIANG / WAN HUI / LI YAYA et al. | Europäisches Patentamt | 2023

    Freier Zugriff