The invention discloses a staged installation method for ship side thruster sections, and relates to the technical field of ship manufacturing and installation, which comprises the following steps: a) a preparation stage: according to technical files provided by a side thruster manufacturer, carrying out integrity check on a side thruster and related systems thereof, and making upper, lower, left and right marks at two ends of a side thruster barrel; b) a wire pulling stage: taking a ship body rib position and a base line as references, and pulling a steel wire on the side thrust subsection for positioning a flow guide pipe and a side thrust cylinder; the method comprises the following steps of (1) installing a flow guide pipe, (2) installing a side thruster cylinder, (3) installing a flow guide pipe, (4) installing a side thruster cylinder, (5) installing a side thruster motor, and (6) installing a gravity oil tank and a hand pump.According to the method, the technical problem that in the prior art, when side thrusters of ships are installed in a segmented mode, operation is complex is solved, and the installation efficiency is improved.
本发明公开了一种船舶侧推分段的阶段安装方法,涉及船舶制造与安装技术领域,其包括以下步骤:a)准备阶段:根据侧推制造厂家提供的技术文件,对侧向推进器及其相关系统进行完整性检查,并在侧推筒体两端做好上下左右标记;b)拉线阶段:以船体肋位和基线为基准,在侧推分段上拉设钢丝线,用于定位导流管和侧推筒体;c)定位安装阶段:对导流管及侧推筒体进行定位安装;d)焊接阶段:将侧推筒体与船体进行焊接;e)安装侧推电机;f)安装重力油箱及手摇泵。本发明解决了现有技术中船舶的侧推分段安装时操作复杂的技术问题,提高了安装效率。
Staged installation method for ship side thrust subsections
一种船舶侧推分段的阶段安装方法
18.03.2025
Patent
Elektronische Ressource
Chinesisch
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Installation method of side thrust grille, side thrust grille and ship
Europäisches Patentamt | 2022
|Construction method for subsections of bottom side cabin of liquefied gas ship
Europäisches Patentamt | 2025
|Europäisches Patentamt | 2021
|Optimal Railway Routing Using Virtual Subsections
British Library Conference Proceedings | 2022
|