The invention discloses a gymnasium large-span roof steel structure synchronous lifting installation aligning device which comprises a base, the interior of the base is of a hollow structure, a two-way screw rod is arranged at the position, close to the top, in the base, and a first motor is fixedly installed at the position, close to the top, of one side of the base. Threaded plates are in threaded connection with the positions, close to the two sides, of the surface of the two-way screw. According to the aligning device for synchronous lifting installation of the large-scale gymnasium large-span roof steel structure, through the design of a two-way screw rod, a first motor, a threaded plate, a supporting column, a lifting plate, a hexagonal rod, a winding roller, a hexagonal sleeve, a lifting rope, a second motor, a driving gear and a driven gear, the first motor is controlled, and the two-way screw rod is made to rotate; through thread transmission of the two-way screw rod and the two thread plates, synchronous relative movement of the two fixed steel structures can be achieved till the steel structures reach the accurate alignment position, and the alignment installation efficiency is remarkably improved.

    本发明公开了一种体育馆大跨度屋盖钢结构同步提升安装的对口装置,包括底座,所述底座的内部为中空结构,所述底座内的靠顶部位置设置有双向螺杆,所述底座一侧的靠顶部位置固定安装有第一电机,所述双向螺杆表面的靠两侧位置均螺纹连接有螺纹板。该大型体育馆大跨度屋盖钢结构同步提升安装的对口装置,通过双向螺杆、第一电机、螺纹板、支撑柱、升降板、六边形杆、卷收辊、六边形套管、吊绳、第二电机、主动齿轮和从动齿轮的设计,控制第一电机,使双向螺杆转动,通过双向螺杆与两个螺纹板的螺纹传动,从而可实现对对固定后的两个钢结构同步相对移动,直至达到精确对口位置,显著提高对口安装效率。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Opening aligning device for synchronous lifting installation of large-span roof steel structure of gymnasium


    Weitere Titelangaben:

    一种体育馆大跨度屋盖钢结构同步提升安装的对口装置


    Beteiligte:
    JIA DONGFENG (Autor:in) / YANG JIAN (Autor:in) / CHENG ANCHUN (Autor:in) / YU TONGDE (Autor:in)

    Erscheinungsdatum :

    13.12.2024


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES / B66D Haspeln , CAPSTANS / E04G SCAFFOLDING , Baugerüste



    Integral lifting device for large-span plane truss steel roof and operation method of integral lifting device

    TANG JINLAI / JIANG FENGCHANG / LIN WANGPENG et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Lifting equipment for large-span steel structure

    YANG FENG / XIA FAGEN / FANG SHUICAI et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    High-altitude large-span connected structure lifting installation device and method thereof

    MU ZHUMENG / XU WEI / SU ZHIHUA et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Large-span steel structure roof hoisting construction method

    XIANG QIAN / JIANG XIANGYANG / WU LEI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Hoisting and sliding device for large-span steel structure roof truss

    XIAN ZUNFENG / YANG ZHIPENG / BI SHENGLI et al. | Europäisches Patentamt | 2024

    Freier Zugriff