The invention discloses a method for installing a multi-core pipe of a ship without a pipe tunnel. The installation method of the pipe tunnel-free ship multi-core pipe comprises the following steps that S1, a vertical ladder is installed, specifically, the vertical ladder is installed in a TRUNK, and the left side and the right side of the vertical ladder are provided with connecting pieces used for binding the multi-core pipe; and S2, the multi-core pipe is installed, specifically, the multi-core pipe is bound to the connecting piece. The problems that in the prior art, the working efficiency is low, and the mounted multi-core pipe affects passing are solved.
本发明公开了一种无管弄船舶多芯管的安装方法。该无管弄船舶多芯管的安装方法包括如下步骤:S1、安装直梯:在TRUNK内安装直梯,直梯的左右两侧带有用于绑扎多芯管的连接件;S2、安装多芯管:将多芯管绑扎在连接件上。本发明解决了现有技术工作效率低下,且安装后的多芯管影响通行的问题。
Installation method for multi-core pipe of ship without pipe tunnel
一种无管弄船舶多芯管的安装方法
01.11.2024
Patent
Elektronische Ressource
Chinesisch
Installation method of ship exhaust pipe and ship exhaust pipe
Europäisches Patentamt | 2024
|Hoisting method for pipe fitting of ship pipe tunnel cabin
Europäisches Patentamt | 2020
|Box ship pipe tunnel sealing plate and using method of box ship pipe tunnel sealing plate
Europäisches Patentamt | 2023
|