Disclosed is a cable handling system (1) for an electric mining or construction vehicle (2) comprising a sliding steered crawler-type or wheeled body (2a) powered by an electric motor for movement. The vehicle (2) is supplied with power by an on-board battery and/or a fuel cell or by a trailing cable (3) arranged to be wound onto and unwound from a cable reel (4) on the vehicle body (2a). The system (1) comprises a cable guide assembly (5, 6) comprising an arm member (5) and a cable guide mechanism (6). The first end (5a) of the arm member (5) is rotatably attached to the rear portion of the vehicle body (2a) so as to be horizontally movable up to about 90 degrees in any direction around the rear portion of the vehicle body (2a) by an arc centered in the direction of the longitudinal axis of the vehicle body (2a). A cable guide mechanism (6) is arranged at the second distal end (5b) of the arm member (5) to receive the cable (3) and to guide the used cable (3) towards the cable spool (4).
公开一种用于电动采矿或施工车辆(2)的缆线装卸系统(1),该电动采矿或施工车辆(2)包括滑动转向的履带式或轮式车身(2a),该电动采矿或施工车辆(2)由电动马达提供动力以进行运动。车辆(2)由车载电池和/或燃料电池或通过拖曳电缆线(3)来供应电力,该拖曳电缆线(3)被布置以被卷绕到车身(2a)上的缆线卷轴(4)上和从车身(2a)上的缆线卷轴(4)解绕。系统(1)包括:缆线引导组件(5,6),包括臂构件(5)和缆线引导机构(6)。臂构件(5)的第一端(5a)可旋转地附接在车身(2a)的后部,以通过以车身(2a)的纵向轴线的方向为中心的弧部在围绕车身(2a)的后部的任一方向上可水平移动高达约90度。缆线引导机构(6)被布置在臂构件(5)的第二远端(5b)处,以接纳缆线(3)并且朝向缆线卷轴(4)引导所使用的缆线(3)。
Cable handling system
缆线装卸系统
05.07.2024
Patent
Elektronische Ressource
Chinesisch
Engineering Index Backfile | 1894
|