The ultrahigh integral hoisting boarding tower device comprises a tower frame, stairs are arranged in the tower frame, a plurality of landing frames are arranged at the two ends of a boarding face of the tower frame, the landing frames are provided with gap bridges, an elevator is arranged on one side face of the tower frame, and an elevator door is arranged on the side face, located on the same side face with the elevator, of a second floor. A gap bridge is arranged at the landing frame, connecting rings are arranged at the top ends of the exteriors of guardrails at the two ends of the landing frame, a connecting ring is also arranged at the top of one end of the gap bridge, and the bottom of the gap bridge is welded with a bottom plate. The two connecting rings located on the same vertical plane are connected through the lock chain, and a worker can adjust the length of the lock chain according to the actual use requirement so as to adapt to the change of the angle between the gap bridge and the landing frame; a worker can rotate angles in the horizontal direction and the vertical direction according to actual use requirements, and therefore practicability is embodied.
本发明的一种超高型可整体吊装登船塔装置,包括塔架,塔架的内部设置有楼梯,塔架的登船面两端设置有若干个登陆架,登路架设置有过桥,塔架的一侧面设置有电梯,从第二楼层与电梯处于同一侧面设置有电梯门,塔架的底部四个腿处的背面固定焊接有等腰三角形板,等腰三角形板的底部焊接有底板,本发明在登陆架处设置有过桥,登陆架的两端护栏的外部顶端设置有连接环,过桥的一端顶部也设置有连接环,两个处于同一竖直面处的连接环之间通过锁链相连接,工作人员可以根据实际使用需要,调整锁链的长度,以适应过桥与登陆架之间的角度发生变化;工作人员还可以根据实际使用需要旋转水平和垂直方向的角度,从而体现实用性。
Ultrahigh boarding tower device capable of being integrally hoisted
一种超高型可整体吊装登船塔装置
2024-04-30
Patent
Elektronische Ressource
Chinesisch
Stable hoisting crane capable of preventing hoisted goods from swinging
Europäisches Patentamt | 2021
|Method for detecting size of object hoisted by tower crane
Europäisches Patentamt | 2023
|