The invention belongs to the technical field of pipeline construction, and particularly relates to a water conservancy construction pipeline burying construction device which comprises a portal frame, a winding machine is installed in the middle of the portal frame, a pull rope is installed on the winding machine, a passing pipe clamping device is installed at the bottom end of the pull rope, and the pipe clamping device comprises a top plate. The front and rear ends of the top plate are provided with cables. The front side and the rear side of the middle frame are each provided with a swing rod, the swing rods are connected with a steel cable, when the pipeline moves, the swing rods are arranged at the top end of the pipeline and located on the front side and the rear side of the pipeline, then the middle frame is lowered, the lower ends of the swing rods cross the center of the pipeline to be in lap joint with the lower portion of the outer side of the pipeline, and the steel cable can be tightened by lifting the middle frame; a pipeline is fixed between the swing rod and the middle frame, the pipeline is rapidly hoisted, after the pipeline is lowered in place, the middle frame is directly lowered, and the swing rod is horizontally moved for rapid separation.

    本发明属于管道施工技术领域,尤其是涉及一种水利施工管道埋管施工装置,包括龙门架,所述龙门架中部安装有收卷机,所述收卷机上安装有拉绳,所述拉绳底端安装有通过夹管装置,所述夹管装置包括一个顶板,所述顶板前后两端安装有线缆。在中架的前后两侧分别安装一个摆杆,在摆杆上连接钢缆,在进行管道的位移时,将摆杆搭在管道顶端,此时摆杆位于管道的前后两侧,之后通过下放中架,使摆杆下端越过管道中心搭接在管道的外侧下部,此时通过上提中架,便可以收紧钢缆,将管道固定在摆杆和中架之间,进行管道的快速吊起,管道下放到位后,直接下方中架,水平移动摆杆进行快速的脱离。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Water conservancy construction pipeline burying construction device


    Weitere Titelangaben:

    一种水利施工管道埋管施工装置


    Beteiligte:
    SONG YANGFAN (Autor:in) / LIN DEBIN (Autor:in) / LEI XIAOFENG (Autor:in)

    Erscheinungsdatum :

    2024-01-30


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES



    Water conservancy pipeline pre-burying construction method

    WANG QINGWEI / WEI WEI / WANG XUEFENG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Pipeline burying device for water conservancy project construction

    HUA WEI | Europäisches Patentamt | 2020

    Freier Zugriff

    Water conservancy construction pipeline pre-burying device and construction method thereof

    ZHANG CHAOXIANG / ZHANG NAN / WANG KAI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Pipeline burying device and method for water conservancy project

    ZHANG YONGJIE / YANG PENG | Europäisches Patentamt | 2023

    Freier Zugriff

    Pipeline burying device for water conservancy project and using method

    RAN LIJUN | Europäisches Patentamt | 2021

    Freier Zugriff