According to the train integrity monitoring system and method, train head satellite positioning equipment is installed at the head of a train locomotive, train tail satellite positioning equipment is installed at a train tail coupler, and train compartment separation sensing equipment is installed at the head of each compartment except the train locomotive; a control module in the train integrity monitoring device obtains train head satellite positioning data from train head satellite positioning equipment, train tail satellite positioning data from train tail satellite positioning equipment and connection state data from train compartment separation sensing equipment in real time; and performing calculation and judgment according to the train head satellite positioning data and the train tail satellite positioning data to generate a first judgment result, performing calculation and judgment according to the connection state data to generate a second judgment result, and performing comprehensive judgment according to the first judgment result and the second judgment result. According to the method, the integrity loss condition of the train can be found in time under the static condition of the train, and the determined safe train length is closer to the real train length of the train.
一种列车完整性监测系统及监测方法,在列车机车的头部安装列首卫星定位设备,在列车尾部车钩处安装列尾卫星定位设备,在除了列车机车之外的每节车厢的头部安装列车车厢分离传感设备,列车完整性监测装置中的控制模块实时获取来自列首卫星定位设备的列首卫星定位数据、来自列尾卫星定位设备的列尾卫星定位数据和来自列车车厢分离传感设备的连接状态数据,根据列首卫星定位数据和列尾卫星定位数据进行计算和判决,生成第一判决结果,同时根据连接状态数据进行计算和判决,生成第二判决结果,根据第一判决结果和第二判决结果进行综合判决。本发明能够在列车静止条件下及时发现列车完整性丢失的状况,且确定的安全车长更接近列车的真实车长。
Train integrity monitoring system and monitoring method
一种列车完整性监测系统及监测方法
2023-10-31
Patent
Elektronische Ressource
Chinesisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |