The invention discloses a unit curtain wall hoisting technology. The unit curtain wall hoisting technology comprises the following steps that firstly, a discharging platform is installed; secondly, the unit curtain wall is transported through a tower crane; thirdly, a hoisting guide rail is installed; 4, hoisting equipment is arranged; 5, operation debugging is conducted on the hoisting system; sixthly, the unit curtain wall is hoisted through a hoisting system; seventhly, the first step to the sixth step are repeated for many times till the unit curtain wall is installed; the hoisting system is arranged, the unit type glass curtain wall is directly hoisted on the outer vertical face of the super high-rise building through the hoisting system during construction, construction is convenient and safe, the construction period can be shortened, and the construction cost can be reduced; by arranging the unloading platform attached to the floor slab, on-site transportation, assembly and disassembly can be completed in an extremely short time, the construction efficiency is improved, meanwhile, the situation that an outdoor tower crane is installed or the operation time of the tower crane is excessively occupied is avoided, and the problems that when the super high-rise building curtain wall unit plate is hoisted, the outdoor tower crane is complex to install, not economical and long in construction period are effectively solved.

    本发明公开了一种单元幕墙吊装工艺,包括以下步骤:步骤一:安装卸料平台;步骤二:塔吊运输单元幕墙;步骤三:安装吊装导轨;步骤四:设置吊装设备;步骤五:对吊装系统进行运行调试;步骤六:通过吊装系统对单元幕墙进行吊装;步骤七:多次重复步骤一至步骤六,直至单元幕墙安装完毕;设置吊装系统,施工时利用吊装系统在超高层建筑的外立面直接吊装单元式玻璃幕墙,施工方便安全,能节约施工周期和施工成本;通过设置依附在楼板上的卸料平台,可在极短时间内完成现场运输、组装、拆卸,提高施工效率,同时避免安装室外塔吊或过多占用塔吊的作业时间,有效的解决超高层建筑幕墙单元板吊装时,室外塔吊安装复杂、不经济及工期较长问题。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Hoisting process for unit curtain wall


    Weitere Titelangaben:

    一种单元幕墙吊装工艺


    Beteiligte:
    LIU XINIAN (Autor:in) / LI SHA (Autor:in) / KONG ZHEN (Autor:in)

    Erscheinungsdatum :

    11.08.2023


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66C Krane , CRANES



    Curtain wall unit piece hoisting equipment and curtain wall unit piece hoisting method

    QIAO XIAOMING / DING SHOUMING / KONG FANFENG | Europäisches Patentamt | 2022

    Freier Zugriff

    Curtain wall unit hoisting device

    HE MIN / JIANG YONGFU / LING DAN et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Unit type curtain wall hoisting device

    ZHENG CHANGWANG / SUN PENGCHENG / SU MINGSHEN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Curtain wall unit body hoisting system

    ZOU BIN / LIU WENZHUO / JIA YANG et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Fabricated curtain wall hoisting equipment and curtain wall hoisting method

    SHAN QIFENG / NA LIYAN / LUO YEKE et al. | Europäisches Patentamt | 2025

    Freier Zugriff