The invention belongs to the technical field of ultra-large pressure vessel equipment transportation, and particularly relates to an on-site in-place method for an ultra-large pressure vessel. According to the method, on-site in-place of the ultra-large pressure vessel is completed through eight steps of collecting in-place current situation information of the ultra-large pressure vessel, drawing up a saddle distribution scheme, drawing up an SPMT vehicle group distribution scheme, checking stability, selecting a crawler crane, assembling and hoisting preparation of an SPMT vehicle group, adjusting a saddle, adjusting the saddle and conveying the ultra-large pressure vessel in place. By the adoption of the technical scheme, the ultra-large pressure container can be safely and efficiently conveyed to the position over the container foundation, it can be guaranteed that the main lifting lug of the equipment container is located under the portal crane, so that equipment can be smoothly hoisted, and cost is saved.
本发明属于超大型压力容器设备运输技术领域,具体地涉及一种超大型压力容器现场就位方法。本发明通过收集超大型压力容器到位现状信息、拟定鞍座分布方案、拟定SPMT车组布车方案、稳定性校核、选择履带吊、SPMT车组的组车及吊装准备、调整鞍座、调整鞍座和运送超大型压力容器就位八个步骤,完成了超大型压力容器现场的就位。采用本发明的技术方案,不仅能够安全、高效的将超大型压力容器运送至容器基础正上方,而且能够保证设备容器主吊耳位于门式起重机正下方,以便设备能够顺利吊装且节约了成本。
On-site in-place method for ultra-large pressure vessel
一种超大型压力容器现场就位方法
2023-06-16
Patent
Elektronische Ressource
Chinesisch
PRESSURE VESSEL ASSEMBLY AND PRESSURE VESSEL PROTECTOR
Europäisches Patentamt | 2023
|PRESSURE VESSEL ASSEMBLY AND PRESSURE VESSEL PROTECTOR
Europäisches Patentamt | 2023
|Bearing turntable for steering of large pressure vessel
Europäisches Patentamt | 2022
|