The invention provides a full-automatic running train interface testing method and device. The method comprises the steps that a communication simulation host is used for replacing a central control unit in a vehicle system, and the communication simulation host is connected with a vehicle-mounted signal unit in a signal system so as to control the vehicle system to communicate with the signal system; acquiring communication data between the vehicle system and the signal system through the communication simulation host; and determining a communication protocol test result between the vehicle system and the signal system according to the communication data, and judging whether the communication protocol between the vehicle system and the signal system is correct or not based on the communication protocol test result. Compared with a simulation mode, the interface testing difficulty can be reduced, and the interface testing efficiency can be improved.

    本发明提供一种全自动运行列车接口测试方法及装置。该方法包括:使用通信模拟主机替换车辆系统中的中央控制单元,并将通信模拟主机与信号系统中的车载信号单元连接,以控制车辆系统与信号系统进行通信;通过通信模拟主机获取车辆系统与信号系统之间的通信数据;根据通信数据确定车辆系统与信号系统之间的通信协议测试结果,基于通信协议测试结果判断车辆系统与信号系统之间的通信协议是否正确。相比于仿真方式,本发明能够降低接口测试的难度,提高接口测试效率。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Full-automatic running train interface testing method and device


    Weitere Titelangaben:

    全自动运行列车接口测试方法及装置


    Beteiligte:
    WANG QUN (Autor:in) / KANG YING (Autor:in) / LIU ZHAN (Autor:in) / ZHANG XIUCHUN (Autor:in) / ZHANG RONGJIA (Autor:in) / LIU CHUNHAI (Autor:in) / YAN GUANGSHENG (Autor:in) / ZHANG TAO (Autor:in)

    Erscheinungsdatum :

    2023-05-30


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / H04L TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION , Übertragung digitaler Information, z.B. Telegrafieverkehr



    Train running resistance testing method, related assembly and train

    GU CHAOJIAN / LI NING / QUAN GUANGHUI et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Simulation method and device for rail transit full-automatic running train sleep awakening function

    SONG JIANWEI / WANG XIAOYONG / LU YIRAN | Europäisches Patentamt | 2020

    Freier Zugriff

    Automatic Regulation of Train Running

    Engineering Index Backfile | 1959


    Remote restart device for fully-automatic running train, train and restart method

    ZHANG SONG / WANG QIANG / LIU ZHIYU | Europäisches Patentamt | 2020

    Freier Zugriff

    Method and device for upgrading remote RM after remote restart of full-automatic running train

    WANG LIMING / LIU HEYE | Europäisches Patentamt | 2022

    Freier Zugriff