The invention provides an equipment installation construction method, which relates to the technical field of equipment construction, and comprises the following steps: equipment transfer: making a sequence for equipment and transporting the equipment from a storage place to a construction place; carrying the equipment at fixed points: carrying the equipment to mounting positions in sequence at the construction site; equipment installation: the equipment is installed according to design requirements; and equipment debugging: respectively debugging the equipment, and carrying out linkage debugging to meet the use requirements. According to the equipment installation and construction method, transportation and installation of the multiple pieces of equipment forming the production line are reasonably planned, orderly construction is conducted, the reliability of construction and installation of the multiple pieces of equipment on the production line and the equipment installation efficiency are improved, and meanwhile the construction safety risk hidden danger is reduced.
本申请提供了一种设备安装施工方法,涉及设备施工技术领域,包括步骤:设备转运:对设备制定顺序并从存放地运输至施工地;设备定点搬运:在施工地将设备依序搬运至安装位置;设备安装:将设备按设计要求进行安装;设备调试:对各设备分别调试,并进行联动调试,以满足使用要求。该设备安装施工方法,对构成产线的多个设备的运输、安装进行合理规划、有序施工,提高了产线多种设备施工安装的可靠性和设备安装效率,同时降低了施工安全风险隐患。
Equipment installation construction method
一种设备安装施工方法
2023-03-21
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Tower crane installation construction method and installation equipment thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Facility construction and equipment installation
NTRS | 1966
|