The invention discloses construction equipment and a construction method of a power tower group, and belongs to the technical field of building construction, the construction equipment comprises a broadening chassis, a luffing mechanism, a telescopic arm body, a bottom supporting device, a hoisting winding device, a luffing winding device, a top lengthening section, a left rocker arm, a right rocker arm, a rotary section and a top vertical rod, the telescopic arm body is rotationally connected to the broadening chassis, the bottom supporting device is arranged at the bottom of the telescopic arm body, the lifting winding device is arranged on the telescopic arm body and located above the bottom supporting device, the amplitude-variable winding device is installed on the lifting winding device, and the amplitude-variable winding device is installed on the telescopic arm body and located above the bottom supporting device. The top lengthening section is arranged at the top of the telescopic arm body, the left rocker arm and the right rocker arm are horizontally installed at the top of the top lengthening section through the rotary joint, and the top vertical rod is vertically arranged at the top of the rotary joint. According to the construction method, the construction operation efficiency can be greatly improved, the construction safety risk is reduced, and the equipment transfer cost is reduced.

    本发明公开了一种电力组塔的施工设备及其施工工法,属于建筑施工技术领域,包括展宽底盘、变幅机构、伸缩臂臂体、底部支撑装置、起吊卷扬装置、变幅卷扬装置、顶部加长节、左右摇臂、回转节和顶部立杆,所述变幅机构铰接在展宽底盘上,所述伸缩臂臂体转动连接在展宽底盘上,所述底部支撑装置设置在伸缩臂臂体的底部,所述起吊卷扬装置设置在伸缩臂臂体上且位于底部支撑装置的上方,所述变幅卷扬装置安装在起吊卷扬装置上,所述顶部加长节设置在伸缩臂臂体的顶部,所述左右摇臂水平通过回转节安装在顶部加长节的顶部,所述顶部立杆竖直设置在回转节的顶部。本发明通过该施工工法可以大大提高施工作业效率,降低施工安全风险,降低设备转运成本。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Construction equipment and construction method of power tower group


    Weitere Titelangaben:

    一种电力组塔的施工设备及其施工工法


    Beteiligte:
    XIN PENG (Autor:in) / XIANG ZHENSONG (Autor:in) / SUN HONGYU (Autor:in) / ZHOU HUI (Autor:in)

    Erscheinungsdatum :

    2023-01-31


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES / E04G SCAFFOLDING , Baugerüste



    Group tower construction supervision method

    PENG YANG / YU FANGQIANG / XIANG YANZHOU et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Tower group arrangement method of tower crane for group pit construction

    CHEN YANG / XUE YEFEI / CAO CHUANWEI et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Construction equipment and construction method for reinforced concrete wind power tower drum

    WANG GUIRONG / KANG YONGLIANG / WANG WENTAO et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Tower group construction method for alternate dislocation tower top lifting

    SONG YOUQIAN | Europäisches Patentamt | 2023

    Freier Zugriff

    Jacking method and system for group tower construction

    WANG BIN / DUAN XIANHANG / FAN XIAOLIANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff