The invention discloses large concrete formwork dismounting and transferring equipment and a construction method thereof.The large concrete formwork dismounting and transferring equipment comprises two cylindrical formworks of semicircular structures, a first assembling frame and a second assembling frame are distributed on the outer sides of the cylindrical formworks in a left-right mode, and driving rods are installed at the top ends of the first assembling frame and the second assembling frame correspondingly; a first lifting table and a second lifting table are installed at the top end of the driving rod, a butt joint plate is installed at the telescopic end of the first telescopic air cylinder, an assembling frame is installed on the surface of one side of the guiding frame, a disassembling and assembling mechanism is installed on the assembling frame, and a pneumatic clamping mechanism is installed between the output end of the second telescopic air cylinder and the surface of the barrel type formwork. And storage mechanisms are arranged at the top ends of the first assembling frame and the second assembling frame on the inner sides of the driving rods, and walking mechanisms are mounted at the bottoms of the first assembling frame and the second assembling frame. By arranging a series of structures, the transfer equipment can transfer a plurality of formworks up and down, high-place operation and automatic disassembly and assembly operation are achieved, and the formwork storage and transfer functions are achieved.

    本发明公开了一种大型混凝土模板拆装转运设备及其施工方法,包括两个半圆结构的筒式模板,筒式模板的外侧呈左右分布有第一组装架和第二组装架,第一组装架和第二组装架的顶端皆安装有驱动杆,驱动杆的顶端安装有第一升降台和第二升降台,第一伸缩气缸的伸缩端部安装有对接板,引导架的一侧表面安装有装配架,且装配架上安装有拆装机构,第二伸缩气缸的输出端与筒式模板表面之间安装有气动夹持机构,驱动杆内侧的第一组装架和第二组装架顶端皆设置有收纳机构,且第一组装架和第二组装架的底部皆安装有行走机构。本发明通过设置有一系列的结构,使得该转运设备,对多个模板进行上下转运,实现高处作业和自动化拆装操作,达到模板收纳和转运功能。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Large concrete formwork dismounting, mounting and transferring equipment and construction method thereof


    Weitere Titelangaben:

    一种大型混凝土模板拆装转运设备及其施工方法


    Beteiligte:
    HUANG ZHIGANG (Autor:in) / ZHAO HAITAO (Autor:in) / ZHAO XUHONG (Autor:in) / YU PEI (Autor:in) / WEN YUFENG (Autor:in)

    Erscheinungsdatum :

    2023-01-17


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E01D BRIDGES , Brücken / B62B Von Hand bewegte Fahrzeuge, z.B. Handkarren oder Kinderwagen , HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS / E04G SCAFFOLDING , Baugerüste



    Concrete box beam formwork mounting and dismounting assistor

    HAO YANBO / ZHANG XIAOLI / ZHENG XUFEN et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Mine underground hydraulic support mounting, dismounting and transferring equipment and construction method

    GAO JIE / GAO JIAN / LIU HAILUN | Europäisches Patentamt | 2023

    Freier Zugriff

    Dismounting, mounting and transferring device for transformer

    LIU ZHAOHUI / ZHANG MINGXU / LI QIANG et al. | Europäisches Patentamt | 2015

    Freier Zugriff

    MOUNTING/DISMOUNTING JIG FOR VALVE BODY AND MOUNTING/DISMOUNTING METHOD THEREOF

    ITO HIROSHI / KAWADA HISASHI | Europäisches Patentamt | 2019

    Freier Zugriff

    Formwork dismounting equipment for movable tetrahedron prefabricating device

    XIE SIXIANG / FAN ZHIYONG / LUO JINGSONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff