The invention relates to roof moving monorail construction equipment and an installation method of the equipment, the roof moving monorail construction equipment comprises a hoisting mechanism, a plurality of tensioning steel cables used for tensioning the hoisting mechanism, a plurality of buttresses and a plurality of overhanging supports, the buttresses are fixed on the same vertical side wall of an upper floor slab and are arranged along the length direction of the side wall at equal intervals, and the overhanging supports are fixed on the same vertical side wall of the upper floor slab. The overhanging supports correspond to the buttresses one to one and are fixedly connected with the buttresses, the overhanging supports are arranged in the direction that the buttresses stretch out of the floor, and the hoisting mechanisms are arranged in the length direction of the buttresses and fixed to the overhanging ends of the overhanging supports; the hoisting mechanism comprises a hoisting rail and an electric hoist, the hoisting rail is arranged along the arrangement trend of the buttresses, the hoisting rail is located at the cantilever tail end of the cantilever support and fixedly connected with the cantilever support, the electric hoist is clamped and embedded in the hoisting rail in a sliding mode, and the curtain wall component can be hoisted through a zipper on the electric hoist; the curtain wall component hoisting device has the effect that the curtain wall component in the closed space can be hoisted.

    本申请涉及一种屋面移动单轨道施工设备及该设备的安装方法,其包括吊装机构、数个用于张拉吊装机构的张拉钢索、数个支墩和数个悬挑支架,数个支墩均固定在上层楼板的同一竖直侧壁上,且均沿所处侧壁长度走向等距设置,悬挑支架与支墩一一对应且均与支墩固定连接,悬挑支架均沿支墩伸出楼板的方向设置,吊装机构沿支墩布置的长度走向设置,且固定于悬挑支架的挑出端;吊装机构包括吊轨和电动葫芦,吊轨沿支墩排布走向设置,吊轨位于悬挑支架的悬挑末端,且与悬挑支架固定连接,电动葫芦滑动卡嵌于吊轨上,且可通过电动葫芦上的拉锁将幕墙部件吊起,本申请具有使在封闭空间内幕墙部件能够被吊装的效果。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Roof moving monorail construction equipment and installation method thereof


    Weitere Titelangaben:

    一种屋面移动单轨道施工设备及该设备的安装方法


    Beteiligte:
    HU XIANGSONG (Autor:in) / LUO DEJUN (Autor:in) / XIA YUXIONG (Autor:in) / LUO BIN (Autor:in) / ZHENG YONGCHAO (Autor:in) / ZHAO CHUNYING (Autor:in)

    Erscheinungsdatum :

    08.07.2022


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66C Krane , CRANES / B66D Haspeln , CAPSTANS



    MONORAIL EQUIPMENT

    JEONG JIN HO | Europäisches Patentamt | 2019

    Freier Zugriff

    Rapid installation method for monorail crane track

    LI XIAOFENG / CAI WENSHENG / ZHANG YIJIN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Removable moving type monorail system

    Europäisches Patentamt | 2019

    Freier Zugriff

    Removable moving type monorail system

    SONG YOUNG PIL | Europäisches Patentamt | 2018

    Freier Zugriff

    Installation and operation of Seattle Monorail system

    Andersen, A.E. | Engineering Index Backfile | 1962