The invention relates to an intelligent early warning tower crane installation construction method. According to the scheme, the method comprises the following steps that S000, construction preparation is conducted; s100, a column bottom supporting pile is constructed; s200, pile top coupling beam construction is carried out; s300, a middle tower crane is installed; s400, a tower crane near the edge is installed; and S500, the tower crane monitoring system is arranged. According to the invention, all-directional monitoring of the tower crane structure is realized, the monitoring precision is improved, and the stress performance of the tower crane structure is improved.
本发明涉及智能预警塔吊安装施工方法,该方案包括以下步骤:S000、施工准备;S100、柱底支撑桩施工;S200、桩顶连梁施工;S300、中部塔吊安装;S400、临边塔吊安装;S500、塔吊监测体系布设。本发明实现了塔吊结构的全方位监控、提升了监控精度、改善塔吊结构的受力性能。
Intelligent early warning tower crane installation construction method
智能预警塔吊安装施工方法
2022-05-06
Patent
Elektronische Ressource
Chinesisch
Building construction tower crane monitoring and early warning method
Europäisches Patentamt | 2020
|Tower crane buttress installation construction method
Europäisches Patentamt | 2023
|Intelligent early warning and monitoring equipment for tower crane
Europäisches Patentamt | 2023
|Intelligent early warning system for high-rise building tower crane
Europäisches Patentamt | 2023
|