The invention discloses a mounting adjustment method for a tower in a modular cold box. The method comprises the following steps of mounting of a temporary supporting frame of a tower, mounting of a combined supporting adjustment device of the tower, hoisting of a modular cold box, adjustment of the tower, butt joint of the tower and the like. According to the invention, the technical problem of mounting adjustment of a tower of a modular cold box from a horizontal state to an upright state is solved, and safe and efficient mounting of the cold box is ensured.
本发明公开了一种模块化冷箱内塔器的安装调整方法,包括以下步骤:塔器临时支撑架的安装、塔器组合式支撑调整装置的安装、模块化冷箱吊装、塔器调整和塔器对接等步骤。本发明解决模块化冷箱的塔器由卧式到直立过程的安装调整技术难题,保证冷箱的安全、高效安装。
Mounting adjustment method for tower in modular cold box
一种模块化冷箱内塔器的安装调整方法
2022-02-08
Patent
Elektronische Ressource
Chinesisch
Ultra-large type tower crane modular combination stepless adjustment attachment rod
Europäisches Patentamt | 2021
|Floating dock for lowering tower mounting gravity center and tower mounting method thereof
Europäisches Patentamt | 2024
|Tower crane mounting structure and method and auxiliary mounting assembly for tower crane
Europäisches Patentamt | 2023
|