The invention discloses a ship bulk pipeline installation method, bulk pipelines required to be installed in a cabin area are fixed on segmented pipelines of all segments in a segmentation stage, when the segments form a block and the block is hoisted to a ship, all the bulk pipelines can be integrally hoisted to the ship along with the block, the transportation time for loading and transporting the bulk pipelines on the ship is greatly saved, the distribution period of the bulk pipelines is greatly shortened, and therefore the installation efficiency of the bulk pipelines is improved, and meanwhile a large amount of manpower and material resources are saved.
本发明公开了一种船舶散装管路安装方法,本发明通过将机舱区域所需安装的散装管路在分段阶段固定在各分段的分段管路上,当分段总组成总段,总段吊装上船时,所有的散装管路可以随总段整体吊装上船,大大节省了散装管路上船以及在船上输送的运输工时,大大缩短了散装管路的配送周期,从而提高了散装管路的安装效率,同时也节省了大量的人力、物力。
Ship bulk pipeline installation method
一种船舶散装管路安装方法
2022-01-14
Patent
Elektronische Ressource
Chinesisch
Segmented staged installation method for unloading plate of bulk cargo ship
Europäisches Patentamt | 2023
|MARINE PIPELINE INSTALLATION SYSTEM AND MARINE PIPELINE INSTALLATION METHOD
Europäisches Patentamt | 2018
|Marine pipeline installation system and marine pipeline installation method
Europäisches Patentamt | 2019
|