The invention discloses a hoisting method for a shed engineering steel structure. The hoisting method comprises the steps of main truss hoisting unit division hoisting, a main truss mounting process and measures, structural subsection stripping, truss subsection position adjustment, truss subsection in-place, truss butt joint measures, gable truss hoisting measures, connection truss and riding track hoisting, skylight hoisting and the like. The hoisting method is good in construction quality and high in working efficiency.
本发明公开了一种棚化工程钢结构吊装方法,包括主桁架桁架吊装单元划分吊装、主桁架安装工艺及措施、结构分段的脱胎、桁架分段调位、桁架分段就位、桁架对接措施、山墙桁架吊装措施、联系桁架及马道吊装、天窗吊装等。本发明施工质量好、工作效率高。
Hoisting method for shed engineering steel structure
棚化工程钢结构吊装方法
2021-07-16
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|New energy electric vehicle hoisting type charging shed
Europäisches Patentamt | 2020
|Dustproof shed with hoisting mechanism for GIS equipment installation
Europäisches Patentamt | 2023
|Steel structure hoisting equipment for constructional engineering
Europäisches Patentamt | 2023
|