The invention relates to a CTC3.0-based bullet train shunting handling method. The method comprises the steps of automatically generating a bullet train shunting route by combining the original trainplan, train number tracking and safety inspection information in a CTC3.0 system with a bullet train shunting plan compilation function; and meanwhile, realizing automatic tracking and automatic changing of the bullet train unit and the train number according to the occupation condition of an interlocking track circuit and in combination with the single execution state of the bullet train shuntingoperation. Compared with the prior art, the method has the advantages that the safety purposes that the whole shunting operation process of the bullet train can be planned, executed and staring-controlled are achieved, and the like.
本发明涉及一种基于CTC3.0的动车所调车的办理方法,该方法利用CTC3.0系统中原有的列车计划、车次跟踪、安全检查信息结合动车调车计划编制功能,实现动车所调车进路的自动生成;同时根据联锁轨道电路的占用情况,结合动车调车作业单执行状态,实现动车车组和车次的自动跟踪与自动变更。与现有技术相比,本发明具有实现动车所调车作业的全过程可计划、可执行和可盯控的安全目的等优点。
CTC3.0-based bullet train shunting handling method
一种基于CTC3.0的动车所调车的办理方法
2021-03-26
Patent
Elektronische Ressource
Chinesisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Shunting locomotive emergency bullet train control device and method
Europäisches Patentamt | 2020
|Bullet train shunting operation safety protection system and method
Europäisches Patentamt | 2015
|CTC3.0-based implementation method for route handling of regional centralized control station
Europäisches Patentamt | 2024
|Method for analyzing peak pushing access of CTC3.0 system
Europäisches Patentamt | 2023
|