The invention discloses a method for erecting a segmented scaffold platform through a portal. The method is applied to a segmented construction process and comprises the following steps of S1, preparing a plurality of portals which are arranged in parallel; S2, arranging a portal interval according to a segmented structure; S3, arranging a plurality of connecting pieces between every two adjacentportals; and S4, laying and fixing scaffold boards on the connecting pieces. The scaffold platform built according to the method is applied to a plurality of sections which are similar in structure and consistent in portal placing position. The method is suitable for multiple sections, repeated assembling and disassembling work is reduced, and the production efficiency is improved.
本发明公开了一种利用门架搭设分段脚手平台的方法,所述方法应用在分段的建造过程中,所述方法包括:S1准备多个平行布设的门架;S2根据分段结构布置门架间距;S3每相邻的两个门架之间设置多个连接件;S4在连接件上铺设、固定脚手板;其中,依据所述方法所建造的脚手平台应用于多个结构相似、门架摆放位置一致的分段。本发明适用于多个分段,减少了重复搭拆的工作,提高了生产效率。
Method for erecting segmented scaffold platform through portal
一种利用门架搭设分段脚手平台的方法
2021-03-12
Patent
Elektronische Ressource
Chinesisch
Ship segmented modular scaffold and erecting method thereof
Europäisches Patentamt | 2022
|Segmented scaffold erecting method and splicing construction method for LNG ship bulwark deck
Europäisches Patentamt | 2023
|Novel freight cableway portal and erecting tool and erecting method thereof
Europäisches Patentamt | 2023
|