The invention discloses a marine hydrological observation device for the offshore wind power engineering, which comprises a floating base, steel cables are fixedly connected to the four corners of thefloating base correspondingly, strutting mechanisms are installed at the bottoms of the four steel cables correspondingly, and drilling mechanisms are installed at the bottoms of the strutting mechanisms. According to the marine hydrological observation device, a drill bit is driven to rotate through a first motor. When the drill bit rotates, the drill bit and the fixing base are driven to move downwards, the fixing base drives the fixing block to move downwards, then the fixing block is as good as the seabed, then the air compressor is started to input air into the air conveying pipe, the air bag is filled with air, then the air bag is expanded by the air, and the expanded air bag pushes the first rotating rod and the second drilling rod to be expanded. Therefore, the first rotating rodand the second rotating rod fix the fixing block in the seabed, the steel cable is prevented from falling off, the floating seat is effectively prevented from shaking and toppling over, and large lossis prevented.
本发明公开了一种用于海上风电工程的海洋水文观测装置,包括浮动座,浮动座的四角处均固定连接有钢索,四个钢索的底部均安装有撑开机构,撑开机构的底部安装有钻孔机构,本发明通过设置的第一电机带动钻头转动,钻头转动时带动钻头和固定座下移,使固定座带动固定块下移,进而使固定块诚如海底,然后启动空气压缩机向输气管内部输入空气,进而使气囊内部的充满气体,进而使气体将气囊撑大,通过撑大的气囊推动第一转杆和第二钻杆撑起,进而使第一转杆和第二转杆将固定块固定在海底内部,进而防止钢索脱落,有效的防止浮动座晃动倾倒,防止造成较大的损失。
Marine hydrological observation device for offshore wind power engineering
一种用于海上风电工程的海洋水文观测装置
2021-02-12
Patent
Elektronische Ressource
Chinesisch
Offshore wind power foundation hoisting integrated engineering ship
Europäisches Patentamt | 2022
|