The invention provides elevator hoistway steel frame offline pre-installation equipment and method. The elevator hoistway steel frame offline pre-installation equipment comprises a bracket fixing plate and a driving assembly. An elevator hoistway steel frame line is pre-installed in a factory in an offline mode, and only assembly is performed on site. According to a tool and the process method, the four surfaces of the elevator shaft steel frame are pre-installed, on-site construction time is greatly saved, generally, the one-week on-site construction cycle can be reduced to one or two days, the construction of the old community is arranged on working days, noise and resident disturbing can be greatly reduced, the personnel is prevented from concentrated in special periods, and the construction is carried out in a staggered mode.
本发明提供一种电梯井道钢架线下预装设备及方法,包括支架固定盘和驱动组件,在工厂内对电梯井道钢架线下预装,现场只进行拼装,该工装和工艺方法可以对电梯井道钢架的四个面都进行预装,可以节省大量现场施工时间,一般一周的现场施工周期可以缩减到一到两天,老旧小区安排在工作日施工可以大大减少噪音扰民,同时避免特殊时期人员集中,错峰施工。
Elevator hoistway steel frame offline pre-installation equipment and method
一种电梯井道钢架线下预装设备及方法
2020-08-07
Patent
Elektronische Ressource
Chinesisch
IPC: | B66B Aufzüge , ELEVATORS |
Steel structure hoistway elevator installation engineering vehicle
Europäisches Patentamt | 2023
|Elevator steel structure hoistway facilitating glass installation
Europäisches Patentamt | 2023
|Steel structure hoistway elevator installation engineering vehicle
Europäisches Patentamt | 2020
|ELEVATOR HOISTWAY WORK FLOOR DEVICE AND ELEVATOR HOISTWAY WORK FLOOR DEVICE INSTALLATION METHOD
Europäisches Patentamt | 2016
|