The invention discloses a scaffold horse and a scaffold building method. The scaffold horse includes a connecting piece and a supporting piece, one end of the connecting piece is welded to a ship body, and the other end is detachably connected to the supporting piece. The scaffold built with the scaffold horse includes at least two alternately disposed longitudinal level bars and at least two transverse level bars alternately disposed between the longitudinal level bars. The building method includes: building a construction platform at a corresponding position on the ship body; welding at least two scaffold horses at a preset position of the ship body, wherein the connecting piece of each scaffold horse is welded to the ship body and each scaffold horse is placed over the construction platform; binding one of the transverse level bars to the construction platform and the scaffold horses; binding arbitrary two longitudinal level bars to the transverse level bars through the first thorough-holes on the supporting pieces of arbitrary two scaffold horses; and binding at least the other transverse level bar between the two longitudinal level bars. According to the invention, the working environment is improved, the building workload is reduced, and the overall safety is enhanced.
Scaffold horse and scaffold building method
28.10.2015
Patent
Elektronische Ressource
Englisch
IPC: | B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen |