The invention discloses a system and method for monitoring the motion state of a construction vertical shaft sinking bucket, and belongs to systems and methods for monitoring construction vertical shaft sinking buckets. The system comprises a dynamic signal collecting and emitting system mounted on a sliding frame, a wireless signal transmission system mounted on the wall of the shaft, and a computer centralized control center mounted in a control computer room. The dynamic signal collecting and emitting system comprises a laser displacement sensor, an industrial camera, a light source and a terminal collecting and emitting controller. The wireless signal transmission system comprises multiple wireless mesh nodes distributed on the wall of the constructed shaft. The computer centralized control center comprises a control host computer and a wireless signal collector. The sinking bucket monitoring method comprises camera calibration, image acquisition, image data uploading, sinking bucket position analysis, dynamic measurement, data storage, monitoring display, data studying and judging and alarming. The system and method have the advantages that the system and method can monitor the motion state of the construction vertical shaft sinking bucket in real time, give out alarm automatically over abnormal states, and guarantee safe operation of the construction vertical shaft sinking bucket.
System and method for monitoring motion state of construction vertical shaft sinking bucket
2015-10-14
Patent
Elektronische Ressource
Englisch
IPC: | B66B Aufzüge , ELEVATORS |
System and method for monitoring motion state of bucket of construction vertical shaft
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2024
|Method and device for testing movement state of sinking bucket
Europäisches Patentamt | 2015
|Skip bucket vertical shaft wellhead sealing maintenance platform
Europäisches Patentamt | 2021
|