The invention relates to the technical field of train control, and discloses a train running chart drawing method. The train running chart drawing method comprises the following steps of acquiring real-time running information, which comprises table numbers, train numbers, position information, time information and train unit numbers corresponding to all trains, of all the trains; calculating all broken line sections corresponding to the train numbers and connecting the two broken line sections corresponding to the train numbers belonging to the same train unit number under the condition that the position information and the time information of the tail of the first broken line section are the same with the corresponding position information and the corresponding time information of the head of the second broken line section; drawing all the broken line sections to obtain broken lines corresponding to the table numbers; and displaying the train numbers on the corresponding broken line sections. When the train numbers are changed, the change information of the train numbers is displayed on the corresponding broken line sections. The invention also provides a train running chart drawing system. By the train running chart drawing method and the train running chart drawing system, the readability and the logicality of a running chart are greatly improved.
Train running chart drawing method and train running chart drawing system
01.04.2015
Patent
Elektronische Ressource
Englisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Train energy-saving running chart optimization system and method
Europäisches Patentamt | 2016
|Train plan running chart generation method and device and electronic equipment
Europäisches Patentamt | 2021
|Train running line drawing method and device, electronic equipment and storage medium
Europäisches Patentamt | 2024
|Train running scheduling method and running scheduling system
Europäisches Patentamt | 2015
|