15 ABSTRACT System and related method for optimizing the operations of a train traveling along a railway line, wherein one or more cameras are installed at a platform of a first station located along the railway line and are adapted to capture images of the train relative to said platform and of passengers over the platform moving for boarding on/de-boarding from the train. An image processing system is configured at least to measure the actual dwell time and to calculate an optimum dwell time for the train at the platform of the first station based on the image data received from said one or more cameras. A first data elaboration system is configured to calculate a predicted dwell time for the train at the platform of an upcoming station along the railway line, based on one or more parameters selected from the group comprising a calculated number of actual passengers inside the train, number of passengers at the platform of the upcoming station, measured actual dwell time and calculated optimum dwell time at the platform of the upcoming station for a preceding train travelling along the railway line, data related to actual environmental conditions along the railway line or parts thereof, data indicative of passengers traffic-related characteristics for a calendar date or part thereof. Date Recue/Date Received 2021-01-19
SYSTEM AND TRANSPORT FOR OPTIMIZING OPERATIONS OF TRAINS TRAVELLING ALONG A RAILWAY LINE
SYSTEME ET TRANSPORT POUR OPTIMISER LES OPERATIONS DE TRAINS VOYAGEANT LE LONG D`UNE LIGNE DE CHEMIN DE FER
2021-07-23
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2015
|SYSTEM AND METHOD FOR CONTROLLING A TRAIN TRAVELLING ALONG A RAILWAY LINE
Europäisches Patentamt | 2023
|Ride comfort of high-speed trains travelling over railway bridges
Tema Archiv | 2005
|Ride comfort of high-speed trains travelling over railway bridges
Taylor & Francis Verlag | 2005
|Ride comfort of high-speed trains travelling over railway bridges
Online Contents | 2005
|