The intervention platform (10) comprises : - a floating base (46), immersed in a body of water (12); - at least a wind turbine equipment lifting tower (100), configured to lift at least an equipment of the wind turbine (20); The intervention platform (10) has at least a heave plate (70) configured to protrude laterally from the floating base (46), the heave plate (70) defining an upper surface (80) configured to engage a lower surface (42) of the offshore wind turbine platform (14). The floating base (46) has at least a ballast receiving volume (84), the intervention platform (10) having a ballast controller (86) configured to control a quantity of ballast received in the ballast receiving volume (84) to lift the upper surface (80) of the offshore heave plate (70) in contact with the lower surface (42) of the offshore wind turbine platform (14).
OFFSHORE FLOATING INTERVENTION PLATFORM INTENDED TO DOCK ON AN OFFSHORE WIND TURBINE PLATFORM, RELATED ASSEMBLY AND INTERVENTION METHOD
10.10.2024
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Floating dock type offshore foundation platform and offshore wind turbine generator
Europäisches Patentamt | 2024
|