A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The 5 presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.
RAILROAD VIRTUAL TRACK BLOCK SYSTEM
02.11.2023
Patent
Elektronische Ressource
Englisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |