According to a method for erecting a final lift facility in a lift shaft (1) of a building (2), a construction phase lift system (3.1; 3.2) is, for the duration of the construction phase of the building, installed in the lift shaft, which increases in height as the building height increases. The construction phase lift system comprises a self-propelled construction phase lift car (4; 54; 64), the useable lifting height of which can be adapted to an increasing lift shaft height, wherein to guide the construction phase lift car (4; 54; 64) along the travel path of same in the lift shaft (1), at least one guide rail (5) is installed, wherein, to drive the construction phase lift car (4; 54; 64), a drive system (7; 7.1-7.4; 57; 67) is mounted which comprises a primary part attached to the construction phase lift car and a secondary part attached along the travel path of the construction phase lift car, wherein the guide rail (5) and the secondary part of the drive system (7; 7.1; 7.2; 7.3; 7.4; 57; 67) are, during the construction phase, extended upwards in steps with the increasing lift shaft height. The self-propelled construction phase lift car (4; 54; 64) is used both to transport people and/or materials for construction of the building (2) and as a passenger and goods lift for storeys already being used as residential or business areas during the construction phase of the building, wherein – after the lift shaft (1) has reached its final height – a final lift system is installed in the lift shaft (1) in place of the construction phase lift system (3.1; 3.2), the final lift system being modified with respect to the construction phase lift system (3.1; 3.2).
Method for erecting a lift facility
2022-06-02
Patent
Elektronische Ressource
Englisch
IPC: | B66B Aufzüge , ELEVATORS |