THE floor-to-floor time to manufacture component parts for an aircraft generator has been halved from one year to six months at the Power Systems Division of Lucas Aerospace, Hemel Hempstead, following reorganisation of its shop floor into production cells.
Aircraft Generators Produced Twice as Quickly
Stand No 5223
Aircraft Engineering and Aerospace Technology ; 62 , 3 ; 5
01.03.1990
1 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Superalloys sawn twice as quickly, and scrap eliminated
Emerald Group Publishing | 2008
Composite panels quickly produced
Kraftfahrwesen | 1982
|Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944
|