INSTALLATION of two Yamazaki CNC machining centres and a computer aided manufacturing (CAM) system at the Leicester works of subcontractor Castillion Precision Engineering Ltd have reduced delivery times by up to 50 percent and dramatically increased their competitiveness in quality and price, according to director Mr Ian Walsh.
Yamazaki Give Aerospace Sub-Contractor the Competitive Edge
Aircraft Engineering and Aerospace Technology ; 58 , 1 ; 18-19
01.01.1986
2 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Stellram Pays Attention says Aerospace Sub-Contractor
British Library Online Contents | 1993
Aerospace Business - Mitsubishi still the top Japanese defense contractor
Online Contents | 2005
Reliable Carbide Tooling is Essential for Aerospace Sub-Contractor Success
Emerald Group Publishing | 1987
Tabletop Design - How tablesettings and plate presentations give restaurants a competitive edge.
Online Contents | 2002
|Yamazaki Multi-Pallet Machining Centre Reduces Lead Time by 75 Per cent
Emerald Group Publishing | 1986