WHEN Westland Helicopters was asked to produce the rotor shafts for the Sikorsky Blackhawk, the manufacturing brief was to deliver 40 shafts per month over two years initially. This required the setting up of a separate machining cell at the Yeovil factory to meet this target. Normal lead time for shafts was between 9–12 months. Armed with a £1.2 millions budget the company looked at 12 machine tool suppliers.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Westland Picks Mazak for Blackhawk Rotor Shafts



    Erscheinungsdatum :

    01.08.1989


    Format / Umfang :

    1 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    FEATURES - Buick Blackhawk

    Online Contents | 2000


    We introduce: Blackhawk

    Online Contents | 1999


    Zylinderpruefgeraet von Blackhawk

    Applied Power Deutschland,Altenstadt | Kraftfahrwesen | 1978


    Neue Motortestgeraete von Blackhawk

    Applied Power Deutschland,Altenstadt | Kraftfahrwesen | 1976


    Westland. The westland aircraft works

    Yeovil / Somerset | Engineering Index Backfile | 1928