SMALL aluminium alloy parts for the BAe 146 passenger aircraft are now being produced on two new Bridgeport machining centres at the Filton works of British Aerospace near Bristol. The result is said to be an average three-fold reduction in floor-to-floor time compared with previous manual machining; and in some cases production is up to 12 times faster.
Aircraft Part Produced up to 12 Times Faster
Aircraft Engineering and Aerospace Technology ; 57 , 9 ; 12-13
01.09.1985
2 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Aircraft pump gears machined 15 times faster
Emerald Group Publishing | 2002
BAe 146 Parts Produced up to 12 Times Faster
Emerald Group Publishing | 1987
Fighter aircraft displays produced 60 per cent faster
Emerald Group Publishing | 2001
Aircraft Hose Fittings Machined up to Four Times Faster
Emerald Group Publishing | 1988
Steering towards faster cycle times
Tema Archiv | 1978
|