Highlights A bus bridging approach to cooperate with the first train operations in a subway network. An explicitly integrated MILP model for the first train and bus bridging timetabling problems. A tailored algorithm for optimally solving the first train timetabling and bus service bridging problems. The model and the approach are applied to the Beijing subway network.

    Abstract Subway system is the main mode of transportation for city dwellers and is a quite significant backbone to a city's operations. One of the challenges of subway network operation is the scheduling of the first trains each morning and its impact on transfers. To deal with this challenge, some cities (e.g. Beijing) use bus ‘bridging’ services, temporarily substituting segments of the subway network. The present paper optimally identifies when to start each train and bus bridging service in an intermodal transit network. Starting from a mixed integer nonlinear programming model for the first train timetabling problem, we linearize and reformulate the model using the auxiliary binary variables. Following that, the bus bridging model is developed to cooperate with the first train operation for reducing long transfer waiting times. After realizing the low computational efficiency of solving the integrated model, a tailored algorithm is designed to optimally solve the first train timetabling and bus service bridging problems. The exact models and algorithms are applied to the Beijing subway network to test their effectiveness and computational efficiency. Numerical results show that our approaches decrease the total passenger waiting time by 53.4% by a combined effect of adjusting the first train departure times and operating 27 bridging buses on 7 routes.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    First train timetabling and bus service bridging in intermodal bus-and-train transit networks


    Beteiligte:
    Kang, Liujiang (Autor:in) / Li, Hao (Autor:in) / Sun, Huijun (Autor:in) / Wu, Jianjun (Autor:in) / Cao, Zhiguang (Autor:in) / Buhigiro, Nsabimana (Autor:in)


    Erscheinungsdatum :

    2021-05-14


    Format / Umfang :

    20 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Robust Train Timetabling

    Cacchiani, Valentina / Toth, Paolo | Springer Verlag | 2018



    Passenger centric train timetabling problem

    Robenek, Tomáš | Online Contents | 2016


    Intermodal Train Makeup

    International Association of Railway Operating Officers | British Library Conference Proceedings | 1998


    Passenger centric train timetabling problem

    Robenek, Tomáš / Maknoon, Yousef / Azadeh, Shadi Sharif et al. | Elsevier | 2016