Highlights We propose positioning of clearance equipment items in anticipation of new equipment requests in order to meet new requirements for location and relocation of clearance equipment, or to rebalance the use of the equipment post disaster. We develop a maximum-weighted flow-with-location problem which incorporates queuing for services that have physical queue delays. A more efficient search for the POMDP approach where unnecessary actions and observations can be eliminated by considering a reliability constraint under a look-ahead policy is proposed. The proposed dynamic approach intends to learn the needs of the road network in order to satisfy demand points using the connection between relief demand and supply nodes. An empirical study of Hurricane Harvey in the City of Houston was performed to supply the needed relief via a positioning strategy for clearance equipment items.

    Abstract Emergency response systems should respond to disasters in a timely and cost-effective manner. One of the most complicated tasks facing managers is debris management. During post-disaster operations, response teams must make road network connections between supplier nodes and demand (population) nodes in order to protect human health and safety. The effectiveness of response operations depends on positioning of relief supplies in anticipation of new clearance equipment requests at new locations, as well as with relocation of clearance equipment items to rebalance the use of items post disaster. To solve this problem, a novel dynamic post-disaster debris clearance problem is introduced—one that features non-myopic positioning of clearance equipment items based on a queuing formulation that is compatible with the maximum-weighted flow problem under incomplete information proposed by Çelik et al., (2015). By including a clearance equipment positioning strategy, we improve the strategy of the stochastic debris clearance problem, with a new framework on dynamically optimizing the post-disaster debris clearance strategy with limited observable information about the disaster-relief resources located on the road network. The proposed dynamic debris clearance approach sets out to satisfy the need for debris clearance and relief services by using the connection between the demand nodes and the supplier nodes in a case where information on the disaster region is only partially observable. An empirical study of Hurricane Harvey in the City of Houston was performed to obtain concepts into the impacts of dynamic programming model and parameters in order to supply the needed relief via a positioning strategy for clearance equipment items.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Dynamic post-disaster debris clearance problem with re-positioning of clearance equipment items under partially observable information


    Beteiligte:
    Sayarshad, Hamid R. (Autor:in) / Du, Xinpi (Autor:in) / Gao, H. Oliver (Autor:in)


    Erscheinungsdatum :

    2020-05-09


    Format / Umfang :

    21 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Battle Field Debris Clearance Robot

    B, Nivethitha S / G, Nareshbabu / S, Jeny Sophia et al. | IEEE | 2023


    Under-keel clearance

    British Library Online Contents | 1997


    Low-clearance hoisting equipment

    LI JIEJIE | Europäisches Patentamt | 2024

    Freier Zugriff

    CLEARANCE SENSOR AND CLEARANCE MEASURING METHOD

    KYOOKA YOSHITERU / ABE MASATO | Europäisches Patentamt | 2020

    Freier Zugriff

    Global Positioning System (GPS) Altitude for Obstacle Clearance

    Thompson, B. / Corley, R. / AHS International | British Library Conference Proceedings | 2009