AbstractThe STS-120/ISS 10A assembly mission was an unprecedented period during the life of the International Space Stations (ISS). The successful completion of the mission laid the foundation for the launch of the European and Japanese laboratories and continued assembly of the station. Unlike previous missions that concluded when the Space Shuttle undocked from the ISS, the 10A mission required critical assembly operations to continue after the Shuttle's departure to relocate the Harmony module to its permanent location and activate its systems. The end-to-end mission lasted for almost a month and required the execution of seven space walks, over 20 major robotics operations, and countless hours of ground commanding. The Canadian built mobile servicing system (MSS) and its robotics space station remote manipulator system (SSRMS) played a key a role in the success of the assembly operations. The mission presented the ISS robotics flight control team (ROBO) with unique challenges during the pre-mission planning and real-time execution of complex assembly tasks. The mission included the relocation of the P6 truss segment from the Z1 Node to its permanent location on the P5 truss; a three day marathon of highly choreographed sequence of robotics operations and space walks, and the reconfiguration of ISS structure to attach Harmony (Node 2) to the US destiny laboratory module; a six day sequence of complex robotics operations the majority of which was executed after the departure of the shuttle and included an unprecedented amount of ground commanded robotics operations. Of all the robotics operations executed during the mission, none were more challenging than supporting the repair of a torn P6 solar array that was damaged during its deployment; a dramatic space walk that pushed the MSS and the robotics flight control team to new limits and required the real-time planning and execution of an intricate series of operations that spanned two days.This paper will present an analysis of the robotics operations executed during the STS-120 and 10A stage mission. The paper will highlight the unique challenges associated with the planning and execution of the P6 truss and Node 2 module relocation tasks, as well as the robotics issues faced during the planning and execution of the solar array repair space walk. The analysis will address the operational techniques and mission planning guideline used to deal with tight timelines, structural loads issues, ISS attitude control issues, and complex interdependencies between various ISS systems during the assembly and solar array repair operations. A discussion of the lessons learned from the planning and execution of these complex robotics tasks will also be presented.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Lessons learned from the STS-120/ISS 10A robotics operations


    Beteiligte:
    Aziz, Sarmad (Autor:in)

    Erschienen in:

    Acta Astronautica ; 66 , 1-2 ; 157-165


    Erscheinungsdatum :

    2009-05-23


    Format / Umfang :

    9 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch







    Lessons Learned from Operations

    Torpy, G. / Royal Aeronautical Society | British Library Conference Proceedings | 2005


    Chandra Operations Lessons Learned

    McKendrick, Leon | AIAA | 2004