Highlights A new practical multi-factory production–distribution problem with multi-port decisions. A new fuzzy guided GA to enhance job allocation searching ability. A new DBC heuristic to reduce the shipping selection complexity. The new approach reduces total cost by 20% with 50% tardiness improvement.

    Abstract This paper studies a practical multi-factory job allocation and scheduling problem involving inland and maritime transport limits. A new heuristic called Due-date Based Cut-off rule (DBC) is developed to improve the computational efficiency of both exact and genetic algorithms (GA). Except the application of DBC, this proposed GA is guided by a novel fuzzy controller aimed at eliminating the drawbacks other GAs have when dealing with multi-factory models. The tests of the solution quality and computational efficiency for this GA are carried out. The numerical experiments demonstrate the value of the proposed approach in this practical global supply chain.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits


    Beteiligte:
    Sun, X.T. (Autor:in) / Chung, S.H. (Autor:in) / Chan, Felix T.S. (Autor:in)


    Erscheinungsdatum :

    2015-04-11


    Format / Umfang :

    18 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch






    MULTI-SPECIALTY INTEGRATED CARE SCHEDULING SYSTEM

    KADRI ALBERT / IBRAHIM MOHAMMED | Europäisches Patentamt | 2023

    Freier Zugriff

    MULTI-SPECIALTY INTEGRATED CARE SCHEDULING SYSTEM

    KADRI ALBERT / KADRI MOHAMMED | Europäisches Patentamt | 2022

    Freier Zugriff

    MULTI-SPECIALTY INTEGRATED CARE SCHEDULING SYSTEM

    KADRI ALBERT / KADRI MOHAMMED | Europäisches Patentamt | 2023

    Freier Zugriff