Joining of canal basins in Antwerp docks cut off industrial development area over 5 1/2 mi long; construction of road tunnel and railway bridge which will soon provide access to area beyond new canal; tunnel, designed for one-way traffic in each of two completely separate tunnel tubes, will have total length of 3738 ft, 2688 ft fully covered, and 525 ft at each end fitted with sun-screen; canal bridge, with total length of 2400 ft, comprises 10 approach bridges in prestressed concrete, four fixed metal spans above basin, and central bascule bridge.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Road tunnel and railway bridge for Antwerp


    Weitere Titelangaben:

    Dock Harbor Authority


    Beteiligte:
    Schepens, G. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1967


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Submerged tunnel in Antwerp

    Engineering Index Backfile | 1968



    New Antwerp-Italy Rail/road Shuttle Service

    British Library Online Contents | 1996


    Storstroem railway and road bridge, Denmark

    Engineering Index Backfile | 1937


    THE REHABILITATION OF THE ANTWERP RING ROAD: ACCOMPANYING MEASURES

    Van Gils, A. / Debaere, P. / Engels, D. et al. | British Library Conference Proceedings | 2007