Construction progress report stressing all-round usefulness of tractor, efficiency of trucks and elevated graders, dredging method of construction of hydraulic fill, etc.
Construction operations at fort peck
Civ Eng (NY)
Civil Engineering (New York) ; 6 , n 7
1936
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fort Peck Tunnel No. 1 Rehabilitation, Fort Peck Dam, Montana
HENRY – Bundesanstalt für Wasserbau (BAW) | 1993
|Year's progress at fort peck constructing servicing adjuncts
Engineering Index Backfile | 1935
Dynamic analysis of Fort Peck Dam : final report
TIBKAT | 1976
|