Description of system installed at Marquesado mine, near Granada, Spain; overburden is excavated in benches with electric shovel with 2 cu yd bucket; Woodford haulage system was installed to transport material to waste dump and to screening plant; individual electric cars controlled from distance, third rail being broken at intervals to divide track system into sections; layout and operating details.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Mechanical haulage in open-cast iron mine


    Weitere Titelangaben:

    Min Mag


    Beteiligte:
    Noel, J. (Autor:in)

    Erschienen in:

    Mines Magazine ; 55 , n 3


    Erscheinungsdatum :

    1936


    Format / Umfang :

    7 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Strip mine haulage

    Woosley, C.W. | Engineering Index Backfile | 1943


    Mine haulage at conda

    Woodward, C.D. | Engineering Index Backfile | 1940


    Automation of mine haulage

    Morton, W.R. | Engineering Index Backfile | 1956


    Safety in coal-mine haulage

    Engineering Index Backfile | 1915


    Mechanical haulage

    Sturgeon, J. | Engineering Index Backfile | 1896